PTE · Describe Image

Dynamics of Informal Settlements: PTE Describe Image practice questions

4 original Describe Image questions. Question 1 is free to record, play back and compare with a sample answer right here; log in free to practise the rest in the BandLadder app.
  • 4 questions
  • Question 1 free, no login
  • PTE Academic and PTE Core
1

Rooftop Solar Adoption Rates

Free to try, no login

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Household Rooftop Solar Uptake Over Five Years (%). Informal Settlement: Year 1 4, Year 2 9, Year 3 18, Year 4 31, Year 5 48. Planned Suburb: Year 1 12, Year 2 19, Year 3 27, Year 4 36, Year 5 44.

Household Rooftop Solar Uptake Over Five Years (%)
01020304050Year 1Year 2Year 3Year 4Year 5
  • Informal Settlement
  • Planned Suburb
View the data
Year 1Year 2Year 3Year 4Year 5
Informal Settlement49183148
Planned Suburb1219273644

Your recording stays in this browser: it is not uploaded or stored.

Questions 2–4

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Read them here; log in to answer and check them.

2

Household Construction Materials

Primary Building Materials in Unplanned Settlements (%). Corrugated Iron 42, Timber Scraps 24, Concrete Blocks 18, Plastic Sheeting 11, Earthen Brick 5.

Primary Building Materials in Unplanned Settlements (%)
  • Corrugated Iron: 42%
  • Timber Scraps: 24%
  • Concrete Blocks: 18%
  • Plastic Sheeting: 11%
  • Earthen Brick: 5%
View the data
CategoryValue (%)
Corrugated Iron42
Timber Scraps24
Concrete Blocks18
Plastic Sheeting11
Earthen Brick5
3

Fire Risk Mitigation Timeline

Community Fire Emergency Protocol. Stage 1: Thermal Sensor Triggers Siren. Stage 2: Community Wardens Mobilise. Stage 3: Main Water Valves Opened. Stage 4: Narrow Lanes Evacuated. Stage 5: Handheld Pumps Deployed. Stage 6: State Emergency Units Arrive.

Community Fire Emergency Protocol
  1. 1.Thermal Sensor Triggers Siren
  2. 2.Community Wardens Mobilise
  3. 3.Main Water Valves Opened
  4. 4.Narrow Lanes Evacuated
  5. 5.Handheld Pumps Deployed
  6. 6.State Emergency Units Arrive
4

Flood Vulnerability Assessment

Settlement Characteristics by Elevation Zone. Columns: Elevation Zone, Drainage Density (m/ha), Average Evacuation Time (mins), Structure Damage Index (1-10). Lowland Basin, 35, 52, 8.4. Mid-slope Plain, 110, 28, 4.6. Upper Terraces, 240, 14, 1.8.

Settlement Characteristics by Elevation Zone
Elevation ZoneDrainage Density (m/ha)Average Evacuation Time (mins)Structure Damage Index (1-10)
Lowland Basin35528.4
Mid-slope Plain110284.6
Upper Terraces240141.8

Want to answer the other 3?

Log in to practise Describe Image in the BandLadder app: the full question bank, with an AI score from BandLadder AI for content, pronunciation and oral fluency on a free account.

Ready for the whole test?

Take a full PTE mock with every question type, the real timings and a score on Pearson's 10–90 scale the moment you finish.

Try a free PTE mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Instant scoring, marked the way Pearson does
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy

Log in to practise all 4