Black Friday: up to 70% off for 24 hours. Unlock your price

PTE · Describe Image

High-Speed Rail Networks: PTE Describe Image practice questions

4 original Describe Image questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 4 questions
  • Free, with answers
  • PTE Academic and PTE Core
  • Updated Oct 2026

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Ballastless Slab Track Installation

Stages of Ballastless Slab Track Construction. Stage 1: Subgrade compaction and stabilising. Stage 2: Hydraulically bound base laying. Stage 3: Precast concrete slab positioning. Stage 4: Precision surveying and alignment. Stage 5: Self-compacting mortar injection. Stage 6: Rail fastening and tensioning.

Stages of Ballastless Slab Track Construction
  1. 1.Subgrade compaction and stabilising
  2. 2.Hydraulically bound base laying
  3. 3.Precast concrete slab positioning
  4. 4.Precision surveying and alignment
  5. 5.Self-compacting mortar injection
  6. 6.Rail fastening and tensioning

Your recording is uploaded only when you request evaluation.

2

Overhead Line Dynamic Oscillations

Contact Wire Uplift by Operating Speed (millimetres). Standard Tension: 150 km/h 22, 200 km/h 31, 250 km/h 44, 300 km/h 62, 350 km/h 88, 400 km/h 125. High Tension: 150 km/h 18, 200 km/h 23, 250 km/h 30, 300 km/h 41, 350 km/h 56, 400 km/h 76.

Contact Wire Uplift by Operating Speed (millimetres)
04080120160200150 km/h200 km/h250 km/h300 km/h350 km/h400 km/h
  • Standard Tension
  • High Tension

Swipe across the chart to see every label, or open the data below.

View the data
150 km/h200 km/h250 km/h300 km/h350 km/h400 km/h
Standard Tension2231446288125
High Tension182330415676

Your recording is uploaded only when you request evaluation.

3

Noise Emission Profile Distribution

Acoustic Sources at 300 km/h (%). Wheel-rail rolling contact 42, Pantograph aerodynamic flow 26, Bogie cavity turbulence 18, Traction motor cooling fans 14.

Acoustic Sources at 300 km/h (%)
  • Wheel-rail rolling contact: 42%
  • Pantograph aerodynamic flow: 26%
  • Bogie cavity turbulence: 18%
  • Traction motor cooling fans: 14%
View the data
CategoryValue (%)
Wheel-rail rolling contact42
Pantograph aerodynamic flow26
Bogie cavity turbulence18
Traction motor cooling fans14

Your recording is uploaded only when you request evaluation.

4

Braking Energy Dissipation Comparison

Energy Dissipation by Braking Subsystem. Columns: Initial Speed, Regenerative Electric, Eddy Current, Friction Disc. 350 km/h, 58%, 28%, 14%. 250 km/h, 66%, 19%, 15%. 150 km/h, 77%, 8%, 15%. 50 km/h, 84%, 0%, 16%.

Energy Dissipation by Braking Subsystem
Initial SpeedRegenerative ElectricEddy CurrentFriction Disc
350 km/h58%28%14%
250 km/h66%19%15%
150 km/h77%8%15%
50 km/h84%0%16%

Your recording is uploaded only when you request evaluation.

Finished all 4 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Ballastless Slab Track Installation — sample answer

Sample answer (84 words, about 40 seconds spoken)

The process diagram illustrates the six successive stages involved in constructing a ballastless slab track for high-speed rail. Initially, the ground undergoes subgrade compaction and stabilising, followed by the laying of a hydraulically bound base. In the intermediate stages, precast concrete slabs are positioned and surveyed with precision alignment before self-compacting mortar is injected underneath. Finally, the steel rails are fastened and tensioned. Overall, the sequence demonstrates a structured progression from geotechnical ground preparation to precise mechanical fastening, ensuring track stability at high speeds.

Key points

  • Identifies the initial stage as subgrade compaction and the final stage as rail fastening
  • Highlights the middle phase involving concrete slab positioning and mortar injection
  • Concludes that the structured sequence ensures long-term track stability for high-speed trains

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy