Black Friday: up to 70% off for 24 hours. Unlock your price

PTE · Describe Image

Modern Roundabout Engineering and Operations: PTE Describe Image practice questions

3 original Describe Image questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 3 questions
  • Free, with answers
  • PTE Academic and PTE Core
  • Updated Oct 2026

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Construction Costs of Junction Types

Average Capital Expenditure by Intersection Type (Thousands of pounds). Initial Construction: Mini Roundabout 180, Compact Roundabout 420, Multi-Lane Roundabout 850, Grade-Separated Junction 2400. Land Acquisition: Mini Roundabout 40, Compact Roundabout 110, Multi-Lane Roundabout 320, Grade-Separated Junction 1100.

Average Capital Expenditure by Intersection Type (Thousands of pounds)
05001,0001,5002,0002,500Mini RoundaboutCompact RoundaboutMulti-Lane RoundaboutGrade-Separated Junction
  • Initial Construction
  • Land Acquisition

Swipe across the chart to see every label, or open the data below.

View the data
Mini RoundaboutCompact RoundaboutMulti-Lane RoundaboutGrade-Separated Junction
Initial Construction1804208502,400
Land Acquisition401103201,100

Your recording is uploaded only when you request evaluation.

2

Annual Fuel Usage Trends

Annual Fleet Fuel Consumption Before and After Conversion (Litres per vehicle). Signalised Corridors: Year 1 480, Year 2 485, Year 3 490, Year 4 475, Year 5 480, Year 6 485. Roundabout Corridors: Year 1 475, Year 2 440, Year 3 390, Year 4 360, Year 5 345, Year 6 340.

Annual Fleet Fuel Consumption Before and After Conversion (Litres per vehicle)
0100200300400500Year 1Year 2Year 3Year 4Year 5Year 6
  • Signalised Corridors
  • Roundabout Corridors

Swipe across the chart to see every label, or open the data below.

View the data
Year 1Year 2Year 3Year 4Year 5Year 6
Signalised Corridors480485490475480485
Roundabout Corridors475440390360345340

Your recording is uploaded only when you request evaluation.

3

Roundabout Collision Types

Proportion of Recorded Collisions by Type (%). Rear-End Impacts 42, Sideswipe Merging 31, Single-Vehicle Run-Off 15, Pedestrian and Cyclist 8, Right-Angle Impacts 4.

Proportion of Recorded Collisions by Type (%)
  • Rear-End Impacts: 42%
  • Sideswipe Merging: 31%
  • Single-Vehicle Run-Off: 15%
  • Pedestrian and Cyclist: 8%
  • Right-Angle Impacts: 4%
View the data
CategoryValue (%)
Rear-End Impacts42
Sideswipe Merging31
Single-Vehicle Run-Off15
Pedestrian and Cyclist8
Right-Angle Impacts4

Your recording is uploaded only when you request evaluation.

Finished all 3 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Construction Costs of Junction Types — sample answer

Sample answer (83 words, about 40 seconds spoken)

The bar chart illustrates average capital expenditure for four junction designs, measured in thousands of pounds across initial construction and land acquisition. Grade-separated junctions represent the costliest option by a substantial margin, requiring 2,400 thousand pounds for construction and 1,100 thousand for land. In contrast, mini roundabouts are the most economical, totalling 180 thousand for building works and 40 thousand for land. Expenditure rises consistently as junction footprint expands, demonstrating that multi-lane and grade-separated configurations demand considerably greater capital investment than single-lane arrangements.

Key points

  • Grade-separated junctions have the highest costs across both categories.
  • Mini roundabouts require the lowest capital expenditure overall.
  • Total expenditure scales directly with the physical size and complexity of the junction.

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy