Subterranean Tunnel Construction: PTE Describe Image practice questions

4 original Describe Image questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 4 questions
  • Free, with answers
  • PTE Academic and PTE Core
  • Updated Oct 2026

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Mountain Highway Tunnel Methods

Average Excavation Speed by Geological Condition (Metres per day). Drill and Blast: Soft Silt 3, Fractured Shale 6, Solid Granite 9, Mixed Gravel 4. Roadheader Excavation: Soft Silt 8, Fractured Shale 11, Solid Granite 2, Mixed Gravel 6.

Average Excavation Speed by Geological Condition (Metres per day)
048121620Soft SiltFractured ShaleSolid GraniteMixed Gravel
  • Drill and Blast
  • Roadheader Excavation

Swipe across the chart to see every label, or open the data below.

View the data
Soft SiltFractured ShaleSolid GraniteMixed Gravel
Drill and Blast3694
Roadheader Excavation81126

Your recording is uploaded only when you request evaluation.

2

Alpine Tunnel Air Quality

Carbon Monoxide Levels Along Tunnel Length (Parts per million). Natural Draft: Portal Entry 5, 2 km 18, 4 km 32, 6 km 45, 8 km 38, 10 km 22, Portal Exit 6. Forced Ventilation: Portal Entry 4, 2 km 8, 4 km 12, 6 km 15, 8 km 14, 10 km 9, Portal Exit 5.

Carbon Monoxide Levels Along Tunnel Length (Parts per million)
01020304050Portal Entry2 km4 km6 km8 km10 kmPortal Exit
  • Natural Draft
  • Forced Ventilation

Swipe across the chart to see every label, or open the data below.

View the data
Portal Entry2 km4 km6 km8 km10 kmPortal Exit
Natural Draft518324538226
Forced Ventilation4812151495

Your recording is uploaded only when you request evaluation.

3

Ground Freezing Support Stages

Artificial Ground Freezing Procedure. Stage 1: Drill perimeter freeze holes. Stage 2: Circulate chilled brine coolant. Stage 3: Form continuous ice wall. Stage 4: Excavate unstable waterlogged ground. Stage 5: Install permanent cast concrete lining. Stage 6: Decommission freeze plant and thaw.

Artificial Ground Freezing Procedure
  1. 1.Drill perimeter freeze holes
  2. 2.Circulate chilled brine coolant
  3. 3.Form continuous ice wall
  4. 4.Excavate unstable waterlogged ground
  5. 5.Install permanent cast concrete lining
  6. 6.Decommission freeze plant and thaw

Your recording is uploaded only when you request evaluation.

4

Shaft Site Logistic Layout

Excavation Shaft Surface Logistics Compound, north at the top. Access Gate in the north-west, Grout Plant in the north, Spoil Holding Bay in the north-east, Main Launch Shaft in the centre, Precast Segment Yard in the south-west, Power Substation in the south-east.

Excavation Shaft Surface Logistics Compound
Access GateGrout PlantSpoil HoldingBayMain Launch ShaftPrecastSegment YardPowerSubstationN

Your recording is uploaded only when you request evaluation.

Finished all 4 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Mountain Highway Tunnel Methods — sample answer

Sample answer (87 words, about 40 seconds spoken)

The bar chart illustrates the average excavation speed in metres per day across four geological conditions using two excavation methods. Solid granite yields the fastest progress for drill and blast at 9 metres per day, while roadheaders achieve only 2 metres per day in the same rock. Conversely, roadheaders perform best in fractured shale, advancing 11 metres per day compared to 6 metres for drill and blast. Overall, mechanical roadheaders excel in softer or fractured ground, whereas traditional blasting remains far more effective in hard rock formations.

Key points

  • Highest advance rate occurs with roadheaders in fractured shale at 11 metres per day
  • Drill and blast vastly outperforms roadheaders in solid granite by 9 metres to 2 metres per day
  • Geological hardness directly determines which excavation method yields optimal progress

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy