Black Friday: up to 70% off for 24 hours. Unlock your price

PTE · Describe Image

Urban Cycling Infrastructure Developments: PTE Describe Image practice questions

4 original Describe Image questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 4 questions
  • Free, with answers
  • PTE Academic and PTE Core
  • Updated Oct 2026

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Cycle Track Separation Barriers

Durability and Cost of Cycle Track Separation Materials (Index score out of 100). Initial cost: Planter boxes 35, Rubber kerbs 25, Steel bollards 60, Concrete dividers 85. Durability rating: Planter boxes 40, Rubber kerbs 55, Steel bollards 75, Concrete dividers 95.

Durability and Cost of Cycle Track Separation Materials (Index score out of 100)
020406080100Planter boxesRubber kerbsSteel bollardsConcrete dividers
  • Initial cost
  • Durability rating

Swipe across the chart to see every label, or open the data below.

View the data
Planter boxesRubber kerbsSteel bollardsConcrete dividers
Initial cost35256085
Durability rating40557595

Your recording is uploaded only when you request evaluation.

2

Public Bike Pump Distribution

Placement of Municipal Bicycle Repair Stations (%). Railway concourses 35, University campuses 25, Public parks 20, Commercial high streets 12, Residential hubs 8.

Placement of Municipal Bicycle Repair Stations (%)
  • Railway concourses: 35%
  • University campuses: 25%
  • Public parks: 20%
  • Commercial high streets: 12%
  • Residential hubs: 8%
View the data
CategoryValue (%)
Railway concourses35
University campuses25
Public parks20
Commercial high streets12
Residential hubs8

Your recording is uploaded only when you request evaluation.

3

E-Bike Charging Hub Layout

Integrated E-Bike Mobility Station Layout, north at the top. Solar canopy in the north, Fast-charging docks in the west, Secure lockers in the centre, Maintenance bay in the east, Pedestrian walkway in the south.

Integrated E-Bike Mobility Station Layout
Solar canopyFast-chargingdocksSecure lockersMaintenance bayPedestrian walkwayN

Your recording is uploaded only when you request evaluation.

4

Retrofitting Protected Bike Corridors

Stages in Retrofitting Urban Protected Bike Corridors. Stage 1: Traffic flow and safety audit. Stage 2: Preliminary corridor design drafting. Stage 3: Public consultation and stakeholder review. Stage 4: Kerb realignment and drainage modification. Stage 5: Installation of physical delineators. Stage 6: Final surface painting and signage deployment.

Stages in Retrofitting Urban Protected Bike Corridors
  1. 1.Traffic flow and safety audit
  2. 2.Preliminary corridor design drafting
  3. 3.Public consultation and stakeholder review
  4. 4.Kerb realignment and drainage modification
  5. 5.Installation of physical delineators
  6. 6.Final surface painting and signage deployment

Your recording is uploaded only when you request evaluation.

Finished all 4 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Cycle Track Separation Barriers — sample answer

Sample answer (81 words, about 40 seconds spoken)

The bar chart illustrates the initial cost and durability ratings of four cycle track separation materials on a 100-point scale. Concrete dividers recorded the highest scores in both categories, with an initial cost of 85 and a durability rating of 95. In contrast, rubber kerbs had the lowest initial cost at 25, accompanied by a modest durability score of 55. Steel bollards achieved intermediate results for both metrics. Overall, physical separators with higher upfront costs demonstrate substantially greater resilience over time.

Key points

  • Concrete dividers have the highest cost and durability scores at 85 and 95 respectively.
  • Rubber kerbs offer the lowest initial expenditure at 25 but lower durability at 55.
  • Higher capital investments correspond directly to greater material longevity.

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy