Black Friday: up to 70% off for 24 hours. Unlock your price

PTE Academic · Retell Lecture

Underground Tunnel Construction: PTE Retell Lecture practice questions

2 original Retell Lecture questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 2 questions
  • Free, with answers
  • PTE Academic
  • Updated Oct 2026

You will hear a lecture. After listening, you have 10 seconds to prepare, then 40 seconds to retell the lecture in your own words.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Earth Pressure Balance Machines

Speaker: British English

Plays once, as in the test: no pausing or replay

0:00 / 1:13

Play the recording first. Then you can record your answer.

Your recording is uploaded only when you request evaluation.

2

Immersed Tube Tunnel Engineering

Speaker: American English

Plays once, as in the test: no pausing or replay

0:00 / 1:01

Play the recording first. Then you can record your answer.

Your recording is uploaded only when you request evaluation.

Finished all 2 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Earth Pressure Balance Machines — sample answer

Model answer (84 words)

The lecture was about using earth pressure balance machines for soft ground tunnelling in urban areas. The speaker explained that these machines prevent ground subsidence by matching the pressure inside an excavation chamber to the surrounding soil pressure. For example, during a coastal railway project, this technique prevented any surface settlement beneath historic buildings. In addition, excavated material is carefully removed using a screw conveyor before concrete segments are installed. Finally, the speaker concluded that this method allows cities to build underground transport safely.

Key points

  • Content: captures the role of pressure balancing, the mechanism, the urban railway example, and the overall benefit.
  • Oral fluency: uses clear transitions and simple connected clauses suitable for a forty-second response.
  • Organisation: follows a logical progression from core technology to practical example and final conclusion.

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Retell Lecture sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy