Black Friday: up to 70% off for 24 hours. Unlock your price

PTE · Describe Image

Modern Container Port Operations: PTE Describe Image practice questions

4 original Describe Image questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 4 questions
  • Free, with answers
  • PTE Academic and PTE Core
  • Updated Oct 2026

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Quayside Crane Productivity

Average Container Moves per Hour by Crane Type (moves per hour). Standard Vessel: Manual Gantry 24, Semi-Automated 30, Dual-Trolley 36, Remote-Controlled 33. Ultra-Large Vessel: Manual Gantry 20, Semi-Automated 27, Dual-Trolley 42, Remote-Controlled 38.

Average Container Moves per Hour by Crane Type (moves per hour)
01020304050Manual GantrySemi-AutomatedDual-TrolleyRemote-Controlled
  • Standard Vessel
  • Ultra-Large Vessel

Swipe across the chart to see every label, or open the data below.

View the data
Manual GantrySemi-AutomatedDual-TrolleyRemote-Controlled
Standard Vessel24303633
Ultra-Large Vessel20274238

Your recording is uploaded only when you request evaluation.

2

Customs Inspection Workflow

Inbound Container Clearance Sequence. Stage 1: Discharge from vessel to yard. Stage 2: Automated manifest risk screening. Stage 3: Non-intrusive radiological scanning. Stage 4: Targeted physical inspection. Stage 5: Documentation clearance and gate exit.

Inbound Container Clearance Sequence
  1. 1.Discharge from vessel to yard
  2. 2.Automated manifest risk screening
  3. 3.Non-intrusive radiological scanning
  4. 4.Targeted physical inspection
  5. 5.Documentation clearance and gate exit

Your recording is uploaded only when you request evaluation.

3

Reefer Energy Consumption Breakdown

Port Terminal Electricity Usage by Subsystem (%). Refrigerated Container Stacks 44, Quayside Gantry Cranes 26, Yard Stacking Equipment 15, High-Mast Yard Lighting 10, Terminal Buildings 5.

Port Terminal Electricity Usage by Subsystem (%)
  • Refrigerated Container Stacks: 44%
  • Quayside Gantry Cranes: 26%
  • Yard Stacking Equipment: 15%
  • High-Mast Yard Lighting: 10%
  • Terminal Buildings: 5%
View the data
CategoryValue (%)
Refrigerated Container Stacks44
Quayside Gantry Cranes26
Yard Stacking Equipment15
High-Mast Yard Lighting10
Terminal Buildings5

Your recording is uploaded only when you request evaluation.

4

Terminal Turnaround Times

Average Dwell and Gate Times by Freight Type. Columns: Cargo Category, Yard Dwell Time (Days), Gate Processing (Mins), Inspection Rate (%). Standard Dry, 3.8, 22, 4. Hazardous Goods, 2.1, 48, 18. Refrigerated, 2.6, 31, 12. Over-Dimensional, 5.4, 55, 25.

Average Dwell and Gate Times by Freight Type
Cargo CategoryYard Dwell Time (Days)Gate Processing (Mins)Inspection Rate (%)
Standard Dry3.8224
Hazardous Goods2.14818
Refrigerated2.63112
Over-Dimensional5.45525

Your recording is uploaded only when you request evaluation.

Finished all 4 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Quayside Crane Productivity — sample answer

Sample answer (83 words, about 40 seconds spoken)

The bar chart illustrates the average container moves per hour achieved by four crane types across two vessel classes. Overall, dual-trolley cranes achieve the highest productivity, reaching 42 moves per hour on ultra-large vessels and 36 on standard ships. In contrast, manual gantry cranes record the lowest output, handling only 20 to 24 containers per hour. Ultra-large vessels generally yield faster operations on advanced systems, whereas manual systems perform worse on larger ships. In conclusion, advanced crane designs significantly accelerate vessel turnaround times.

Key points

  • Dual-trolley cranes achieve the highest productivity across both vessel sizes
  • Manual gantry cranes record the lowest throughput, particularly on ultra-large ships
  • Modern crane configurations substantially improve handling speeds on mega-vessels

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy