Black Friday: up to 70% off for 24 hours. Unlock your price

PTE · Describe Image

Planned New Towns: PTE Describe Image practice questions

4 original Describe Image questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 4 questions
  • Free, with answers
  • PTE Academic and PTE Core
  • Updated Oct 2026

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Eco Town Energy Mix

Projected Energy Sources for Eco District (%). Solar PV 40, District Biomass 25, Wind Turbines 20, Geothermal 10, Grid Backup 5.

Projected Energy Sources for Eco District (%)
  • Solar PV: 40%
  • District Biomass: 25%
  • Wind Turbines: 20%
  • Geothermal: 10%
  • Grid Backup: 5%
View the data
CategoryValue (%)
Solar PV40
District Biomass25
Wind Turbines20
Geothermal10
Grid Backup5

Your recording is uploaded only when you request evaluation.

2

Master Plan Layout

Zoning Layout for Waterfront Town, north at the top. Civic Plaza in the centre, Commercial Core in the west, Residential North in the north, Residential South in the south, Marina Promenade in the east.

Zoning Layout for Waterfront Town
Civic PlazaCommercial CoreResidential NorthResidential SouthMarina PromenadeN

Your recording is uploaded only when you request evaluation.

3

Town Construction Stages

Phased Development of Planned Settlement. Stage 1: Site clearance and earthworks. Stage 2: Trunk utility installation. Stage 3: Primary road network construction. Stage 4: Anchor civic buildings erection. Stage 5: Residential neighbourhood rollout. Stage 6: Public park landscaping.

Phased Development of Planned Settlement
  1. 1.Site clearance and earthworks
  2. 2.Trunk utility installation
  3. 3.Primary road network construction
  4. 4.Anchor civic buildings erection
  5. 5.Residential neighbourhood rollout
  6. 6.Public park landscaping

Your recording is uploaded only when you request evaluation.

4

Transit Mode Comparison

Travel Mode Shares in New Town Development. Columns: Decade, Public Transit, Cycling and Walking, Private Vehicle. Phase 1, 20%, 15%, 65%. Phase 2, 35%, 25%, 40%. Phase 3, 45%, 35%, 20%. Target, 50%, 40%, 10%.

Travel Mode Shares in New Town Development
DecadePublic TransitCycling and WalkingPrivate Vehicle
Phase 120%15%65%
Phase 235%25%40%
Phase 345%35%20%
Target50%40%10%

Your recording is uploaded only when you request evaluation.

Finished all 4 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Eco Town Energy Mix — sample answer

Sample answer (70 words, about 40 seconds spoken)

This pie chart illustrates the projected energy sources for a newly planned eco district. Solar PV forms the largest share at 40%, followed by district biomass at 25% and wind turbines at 20%. Geothermal energy accounts for 10%, while grid backup represents the smallest portion at only 5%. Overall, renewable energy sources make up the vast majority of the district supply, demonstrating a clear commitment towards achieving local carbon neutrality.

Key points

  • Solar PV represents the dominant energy source at 40%.
  • Grid backup contributes the smallest proportion at just 5%.
  • The energy model relies almost entirely on sustainable local generation.

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy