Black Friday: up to 70% off for 24 hours. Unlock your price

PTE · Describe Image

Principles of Bridge Engineering: PTE Describe Image practice questions

4 original Describe Image questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 4 questions
  • Free, with answers
  • PTE Academic and PTE Core
  • Updated Oct 2026

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Maximum Spans by Structural Type

Maximum Economic Span by Bridge Type (metres). Maximum Span: Beam 150, Truss 450, Arch 600, Cable-stayed 1100, Suspension 2000.

Maximum Economic Span by Bridge Type (metres)
04008001,2001,6002,000BeamTrussArchCable-stayedSuspension

Swipe across the chart to see every label, or open the data below.

View the data
BeamTrussArchCable-stayedSuspension
Maximum Span1504506001,1002,000

Your recording is uploaded only when you request evaluation.

2

Aerodynamic Damping of Bridge Decks

Bridge Deck Oscillation Amplitude under Wind Speeds (millimetres). Unmodified Deck: 20 km/h 5, 40 km/h 12, 60 km/h 28, 80 km/h 65, 100 km/h 140, 120 km/h 260. Aerodynamic Fairing: 20 km/h 2, 40 km/h 5, 60 km/h 10, 80 km/h 22, 100 km/h 45, 120 km/h 80.

Bridge Deck Oscillation Amplitude under Wind Speeds (millimetres)
010020030040050020 km/h40 km/h60 km/h80 km/h100 km/h120 km/h
  • Unmodified Deck
  • Aerodynamic Fairing

Swipe across the chart to see every label, or open the data below.

View the data
20 km/h40 km/h60 km/h80 km/h100 km/h120 km/h
Unmodified Deck5122865140260
Aerodynamic Fairing2510224580

Your recording is uploaded only when you request evaluation.

3

Balanced Cantilever Construction Stages

Balanced Cantilever Bridge Construction Sequence. Stage 1: Construct foundation and central pier. Stage 2: Erect pier table and formwork travellers. Stage 3: Cast matching segments symmetrically outward. Stage 4: Tension internal post-tensioning cables. Stage 5: Advance travellers to next segment. Stage 6: Cast closure segment at mid-span.

Balanced Cantilever Bridge Construction Sequence
  1. 1.Construct foundation and central pier
  2. 2.Erect pier table and formwork travellers
  3. 3.Cast matching segments symmetrically outward
  4. 4.Tension internal post-tensioning cables
  5. 5.Advance travellers to next segment
  6. 6.Cast closure segment at mid-span

Your recording is uploaded only when you request evaluation.

4

Bridge Girder Material Selection

Performance Characteristics of Bridge Girder Materials. Columns: Material, Density (kg/m3), Tensile Strength (MPa), Estimated Lifespan (Years). Structural Steel, 7850, 450, 100. Prestressed Concrete, 2450, 40, 80. Carbon Fibre Composite, 1600, 1500, 120. Glulam Timber, 550, 30, 50.

Performance Characteristics of Bridge Girder Materials
MaterialDensity (kg/m3)Tensile Strength (MPa)Estimated Lifespan (Years)
Structural Steel7850450100
Prestressed Concrete24504080
Carbon Fibre Composite16001500120
Glulam Timber5503050

Your recording is uploaded only when you request evaluation.

Finished all 4 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Maximum Spans by Structural Type — sample answer

Sample answer (89 words, about 40 seconds spoken)

This bar chart illustrates the maximum economic span length in metres for five distinct bridge types. Suspension bridges achieve by far the greatest distance, reaching two thousand metres, followed by cable-stayed designs at eleven hundred metres. In contrast, conventional beam bridges display the shortest span, reaching only one hundred and fifty metres, while truss and arch bridges span four hundred and fifty and six hundred metres respectively. Overall, the data demonstrates that tensile cable structures are significantly better suited for spanning wider gaps than rigid beam or arch systems.

Key points

  • Suspension bridges have the largest maximum span at 2000 metres.
  • Beam bridges record the shortest maximum span at only 150 metres.
  • Cable-supported designs provide a decisive advantage over rigid structural forms for wide crossings.

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy