Black Friday: up to 70% off for 24 hours. Unlock your price

PTE · Describe Image

Traffic Light Systems and Operations: PTE Describe Image practice questions

4 original Describe Image questions. Attempt every question free without a login. Check objective answers instantly, or request AI feedback on your writing or speaking before signing up. Then continue practising with a free account.
  • 4 questions
  • Free, with answers
  • PTE Academic and PTE Core
  • Updated Oct 2026

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Record and play back your answer in this browser. Request AI evaluation when you are ready; only then is your recording uploaded.

1

Traffic Signal Hardware Failures

Reported Causes of Signal Outages (Incidents per Year). Urban Network: Power Disruption 120, Cable Faults 85, Controller Bugs 40, Vehicle Collision 65, Weather Damage 30. Rural Highways: Power Disruption 90, Cable Faults 35, Controller Bugs 15, Vehicle Collision 45, Weather Damage 75.

Reported Causes of Signal Outages (Incidents per Year)
04080120160200Power DisruptionCable FaultsController BugsVehicle CollisionWeather Damage
  • Urban Network
  • Rural Highways

Swipe across the chart to see every label, or open the data below.

View the data
Power DisruptionCable FaultsController BugsVehicle CollisionWeather Damage
Urban Network12085406530
Rural Highways9035154575

Your recording is uploaded only when you request evaluation.

2

Emergency Vehicle Preemption Sequence

Emergency Vehicle Preemption Stages. Stage 1: Optical or Radio Sensor Detects Approaching Siren. Stage 2: Controller Aborts Active Green Phase Safely. Stage 3: Brief All-Red Clearance Interval Displayed. Stage 4: Dedicated Green Corridor Granted to Emergency Route. Stage 5: Normal Signal Cycle Resumes Following Departure.

Emergency Vehicle Preemption Stages
  1. 1.Optical or Radio Sensor Detects Approaching Siren
  2. 2.Controller Aborts Active Green Phase Safely
  3. 3.Brief All-Red Clearance Interval Displayed
  4. 4.Dedicated Green Corridor Granted to Emergency Route
  5. 5.Normal Signal Cycle Resumes Following Departure

Your recording is uploaded only when you request evaluation.

3

Solar Powered Signal Installation Cost

Capital Expenditure for Off-Grid Signals (%). Photovoltaic Panels 25, Battery Storage Units 35, LED Signal Heads 15, Mounting Masts 10, Installation Labour 15.

Capital Expenditure for Off-Grid Signals (%)
  • Photovoltaic Panels: 25%
  • Battery Storage Units: 35%
  • LED Signal Heads: 15%
  • Mounting Masts: 10%
  • Installation Labour: 15%
View the data
CategoryValue (%)
Photovoltaic Panels25
Battery Storage Units35
LED Signal Heads15
Mounting Masts10
Installation Labour15

Your recording is uploaded only when you request evaluation.

4

Traffic Signal Maintenance Comparison

Signal Lamp Technologies. Columns: Technology, Power Draw, Lifespan, Unit Replacement Cost. Incandescent, 150 W, 1,000 Hours, £15. Halogen, 75 W, 3,000 Hours, £25. Solid-State LED, 12 W, 60,000 Hours, £110.

Signal Lamp Technologies
TechnologyPower DrawLifespanUnit Replacement Cost
Incandescent150 W1,000 Hours£15
Halogen75 W3,000 Hours£25
Solid-State LED12 W60,000 Hours£110

Your recording is uploaded only when you request evaluation.

Finished all 4 questions?

See the sample answers, transcripts and key points to compare with your recordings. Free, no login needed.

A sample answer from this practice set

Try the task first, then compare your response with this example. This is an authored sample, not a score for your response.

Show item 1: Traffic Signal Hardware Failures — sample answer

Sample answer (87 words, about 40 seconds spoken)

The bar chart illustrates the annual number of traffic signal outages across urban networks and rural highways, categorised by five distinct causes. Power disruption represents the leading cause in urban areas at 120 incidents, followed by cable faults at 85. In contrast, rural highways experience far fewer cable faults at 35, but suffer significantly higher weather damage at 75 incidents. Controller bugs account for the lowest disruption in both environments. Overall, urban outages stem primarily from infrastructural wiring, whereas rural signals are more vulnerable to environmental conditions.

Key points

  • Power disruption is the highest cause of urban outages at 120 incidents.
  • Weather damage is much higher on rural highways (75) than in urban networks (30).
  • Urban signal reliability depends on electrical infrastructure, while rural junctions face environmental vulnerabilities.

Ready for the whole test?

Practise the full test format with timed sections and BandLadder AI feedback.

Take a free mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Objective answer checks and model answers
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy