PTE · Describe Image

Modern Airport Infrastructure and Operations: PTE Describe Image practice questions

4 original Describe Image questions. Question 1 is free to record, play back and compare with a sample answer right here; log in free to practise the rest in the BandLadder app.
  • 4 questions
  • Question 1 free, no login
  • PTE Academic and PTE Core
1

Acoustic Insulation in Departure Lounges

Free to try, no login

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Sound Level Reduction by Acoustic Material (decibels). Low Frequency: Laminated Glass 12, Perforated Timber 18, Fabric Baffles 22, Porous Plaster 15. High Frequency: Laminated Glass 28, Perforated Timber 34, Fabric Baffles 42, Porous Plaster 31.

Sound Level Reduction by Acoustic Material (decibels)
01020304050Laminated GlassPerforated TimberFabric BafflesPorous Plaster
  • Low Frequency
  • High Frequency
View the data
Laminated GlassPerforated TimberFabric BafflesPorous Plaster
Low Frequency12182215
High Frequency28344231

Your recording stays in this browser: it is not uploaded or stored.

Questions 2–4

Look at the image below. You have 25 seconds to study it, then 40 seconds to describe in detail what it shows.

Read them here; log in to answer and check them.

2

Stormwater Runoff Management Process

Runway Surface Runoff Remediation. Stage 1: Collection via slotted apron drains. Stage 2: Initial sediment filtration in underground basins. Stage 3: Biological degradation through reed bed wetlands. Stage 4: Secondary monitoring for deicing chemical traces. Stage 5: Safe discharge into local watercourses.

Runway Surface Runoff Remediation
  1. 1.Collection via slotted apron drains
  2. 2.Initial sediment filtration in underground basins
  3. 3.Biological degradation through reed bed wetlands
  4. 4.Secondary monitoring for deicing chemical traces
  5. 5.Safe discharge into local watercourses
3

Intermodal Ground Transport Connections

Passenger Arrival Modes at Regional Hub (%). High-Speed Rail 38, Private Vehicle 26, Express Coach 18, Metro Line 12, Taxis 6.

Passenger Arrival Modes at Regional Hub (%)
  • High-Speed Rail: 38%
  • Private Vehicle: 26%
  • Express Coach: 18%
  • Metro Line: 12%
  • Taxis: 6%
View the data
CategoryValue (%)
High-Speed Rail38
Private Vehicle26
Express Coach18
Metro Line12
Taxis6
4

Terminal Security Checkpoint Floor Plan

Screening Hall Spatial Layout, north at the top. Queue Staging Area in the north, Automated Tray Return in the west, Body Scanners in the centre, Secondary Search in the east, Repacking and Exit Concourse in the south.

Screening Hall Spatial Layout
Queue Staging AreaAutomatedTray ReturnBody ScannersSecondarySearchRepacking and Exit ConcourseN

Want to answer the other 3?

Log in to practise Describe Image in the BandLadder app: the full question bank, with an AI score from BandLadder AI for content, pronunciation and oral fluency on a free account.

Ready for the whole test?

Take a full PTE mock with every question type, the real timings and a score on Pearson's 10–90 scale the moment you finish.

Try a free PTE mock →

Keep practising

More Describe Image sets

Practise every PTE question type

  • ✓Full question bank for every type
  • ✓Instant scoring, marked the way Pearson does
  • ✓BandLadder AI scoring for speaking and writing
Practise in the app

Free account · no card

© 2026 BandLadder. Written and checked by the BandLadder team. You may quote or cite this page with credit to BandLadder and a link to it; republishing it in full needs our written permission. Content use policy

Log in to practise all 4